1 cubic feet of lime concrete to tonnes
1 cubic feet of lime concrete equals 0.0544 tonnes
Volume to 'Weight' Converter - Construction
How to convert 1 cubic feet of lime concrete to tonnes?
To convert a quantity of a substance or material expressed as a volume to mass we simply use the formula:
mass = density × volume
We want to calculate the mass in tonnes from a volume in cubic feet. We have the density table at the bottom of this web page that shows us the densities values in kg/m³, so we will use the folowing formula (see why below):
mass = d × v × vcfmcf, where mcf is the conversion factor to convert from tonne to kilogram (table near the end of this page) and vcf is the conversion factor to convert from cubic feet to cubic meters.
So, plugging these values in the formula above, we get:
mass = 1920 × 1 × 0.02831681000
mass = 54.36831000
mass = 0.0543683 tonnes (answer)
To learn more on how to convert from volume to mass click here!
Cubic feet of lime concrete to tonnes Chart
Cubic feet of lime concrete to tonnes | ||
---|---|---|
0.1 cubic feet of lime concrete | = | 0.00544 tonnes |
1/5 cubic feet of lime concrete | = | 0.0109 tonnes |
0.3 cubic feet of lime concrete | = | 0.0163 tonnes |
0.4 cubic feet of lime concrete | = | 0.0217 tonnes |
1/2 cubic feet of lime concrete | = | 0.0272 tonnes |
0.6 cubic feet of lime concrete | = | 0.0326 tonnes |
0.7 cubic feet of lime concrete | = | 0.0381 tonnes |
0.8 cubic feet of lime concrete | = | 0.0435 tonnes |
0.9 cubic feet of lime concrete | = | 0.0489 tonnes |
1 cubic feet of lime concrete | = | 0.0544 tonnes |
Cubic feet of lime concrete to tonnes | ||
---|---|---|
1 cubic feet of lime concrete | = | 0.0544 tonnes |
1.1 cubic feet of lime concrete | = | 0.0598 tonnes |
1 1/5 cubic feet of lime concrete | = | 0.0652 tonnes |
1.3 cubic feet of lime concrete | = | 0.0707 tonnes |
1.4 cubic feet of lime concrete | = | 0.0761 tonnes |
1 1/2 cubic feet of lime concrete | = | 0.0816 tonnes |
1.6 cubic feet of lime concrete | = | 0.087 tonnes |
1.7 cubic feet of lime concrete | = | 0.0924 tonnes |
1.8 cubic feet of lime concrete | = | 0.0979 tonnes |
1.9 cubic feet of lime concrete | = | 0.103 tonnes |
Note: some values may be rounded.
References:
FAQs on lime concrete weight to volume conversion
1 cubic feet of lime concrete equals how many tonnes?
1 cubic feet of lime concrete is equivalent 0.0544 tonnes.
How much is 0.0544 tonnes of lime concrete in cubic feet?
0.0544 tonnes of lime concrete equals 1 cubic feet.