100 cubic yards of lime concrete equals 147 ( ~ 146 3/4) tonnes

Volume to 'Weight' Converter - Construction

Inputs

?Notes: the results in this calculator are rounded (by default) to 3 significant figures. The densities values are show and are valid for a certain temperature. Don't use this calculator for critical purposes, unless you know what you are doing exactly.
?Please, choose an substance by typing its name in the left box.

From

?Please, select the volume unit (Cubic meter, gallon ...) to which you want to convert, then select its quantity. Ex.: 1, 1/2, ...

To

?Please, select the weight unit (kilogram, tonne, pound, etc.), then press / click the 'Calculate' button.
Significant Figures:

Results

100 cubic yards of lime concrete weighs 147 ( ~ 146 3/4) tonnes.

146.79453 tonnes precisely. Some values are approximate.

How to convert 100 cubic yards of lime concrete to tonnes?

To convert a quantity of a substance or material expressed as a volume to mass we simply use the formula:

mass = density × volume

We want to calculate the mass in tonnes from a volume in cubic yards. We have the density table at the bottom of this web page that shows us the densities values in kg/m³, so we will use the folowing formula (see why below):

mass = d × v × vcfmcf, where mcf is the conversion factor to convert from tonne to kilogram (table near the end of this page) and vcf is the conversion factor to convert from cubic yard to cubic meters.

So, plugging these values in the formula above, we get:

mass = 1920 × 100 × 0.7645551000

mass = 1467951000

mass = 146.795 tonnes (answer)

To learn more on how to convert from volume to mass click here!

Cubic yards of lime concrete to tonnes Chart

Cubic yards of lime concrete to tonnes
10 cubic yards of lime concrete = 14.7 tonnes
20 cubic yards of lime concrete = 29.4 tonnes
30 cubic yards of lime concrete = 44 tonnes
40 cubic yards of lime concrete = 58.7 tonnes
50 cubic yards of lime concrete = 73.4 tonnes
60 cubic yards of lime concrete = 88.1 tonnes
70 cubic yards of lime concrete = 103 tonnes
80 cubic yards of lime concrete = 117 tonnes
90 cubic yards of lime concrete = 132 tonnes
100 cubic yards of lime concrete = 147 tonnes
Cubic yards of lime concrete to tonnes
100 cubic yards of lime concrete = 147 tonnes
110 cubic yards of lime concrete = 161 tonnes
120 cubic yards of lime concrete = 176 tonnes
130 cubic yards of lime concrete = 191 tonnes
140 cubic yards of lime concrete = 206 tonnes
150 cubic yards of lime concrete = 220 tonnes
160 cubic yards of lime concrete = 235 tonnes
170 cubic yards of lime concrete = 250 tonnes
180 cubic yards of lime concrete = 264 tonnes
190 cubic yards of lime concrete = 279 tonnes

Note: some values may be rounded.

FAQs on lime concrete weight to volume conversion

100 cubic yards of lime concrete equals how many tonnes?

100 cubic yards of lime concrete is equivalent 147 ( ~ 146 3/4) tonnes.

How much is 147 tonnes of lime concrete in cubic yards?

147 tonnes of lime concrete equals 100 cubic yards.